|
Material |
glass |
Capacity |
250ml 300ml 350ml 400ml 500ml 750ml |
Surface Handling |
hot stamping,silk screen printing,coated,frosting,decal,etc. |
MOQ |
2,000pcs |
Use |
Beverage,milk,soft water,tea,coffee,juice, etc. |
Sample |
Carton packed with full height palletized/Carton packed with double stacks/Carton packed with floor loaded/Bulk |
Delivery time |
5-7days if we have stock, or 25-30 days after deposit |
Origin |
Shandong, China |
1. What is the cost of your glass jars?
The price is contingent upon the jar shape, order quantity, and chosen packaging method.
2. How can we be assured of the quality of our order?
We rigorously control your order quality based on our mutually agreed AQL standards.
DEFECTS |
AQL |
Critical |
0% |
Major |
0.65% |
Minor |
2.5% |
Level 1 Level 2
Lot SizeInspectionInspection
2 to 822
9 to 1522
16 to 25 22
25 to 50 38
51 to 90 513
91 to 150820
151 to 2801332
281 to 5002050
501 to 12003280
1201 to 320050125
3201 to 10,000 80200
10,001 to 35,000125315
35,001 to 150,000200500
150,001 to 500,000315800
500,001 and over5001250
3. What types of packaging options do you offer?
Bulk packaging with full-height palletization
Bulk packaging with half-height palletization
Carton packaging with palletization
Carton packaging with floor loading
Other options for customized packaging tailored to your needs
4. Are your glass jars safe for food packaging?
Our glass jars have been rigorously tested by SGS, adhering to TPCH standards and free from heavy metals.
5. Can you manufacture our custom designs?
Absolutely, we can customize your jar. Please send us your design drawings or a sample, and we will develop a drawing
for your approval.
6. Can you also supply lids for our jars?
Yes, we work with top lid manufacturers and can ship them together with your order.
7. How many days can I get my sample and how many days can you deliver our order?
Once the drawing is approved, creating the sample unit mold takes approximately 20 days, followed by an additional 10 days for sampling. .
After the sample is approved, the production time typically requires around 35 days.
8. What's the MOQ?
Our minimum order quantity (MOQ) is 1X40HQ.
9. What are your payment terms?
We accept a 30% T/T deposit, with the remaining 70% balance due before loading.
10. What are your shipping terms?
Typically, as glass is considered heavy cargo, customers prefer to ship it by sea or train.